AR 710-2-2 PDF

Home arrow Military Publications – Army Regulations – USAHEC arrow AR Supply Policy Below the National Level. Reference URL. In a manual supply operation this regulation is used in conjunction with DA Pam –2–1 and DA Pam –2–2. Applicability. This regulation applies to the. DA PAM SUPPLY SUPPORT ACTIVITY SUPPLY SYSTEM: MANUAL PROCEDURES. CLICK HERE TO DOWNLOAD FROM APD. Recently Added.

Author: Shaktimi Mudal
Country: Mauritania
Language: English (Spanish)
Genre: Environment
Published (Last): 12 May 2007
Pages: 126
PDF File Size: 3.40 Mb
ePub File Size: 3.24 Mb
ISBN: 156-8-40875-400-6
Downloads: 40648
Price: Free* [*Free Regsitration Required]
Uploader: Shakamuro

Bench stocks are authorized for all maintenance activities.

To qualify for bench stock, an item must meet all the xr listed in 1 through 5 below. The DFAS prepares general ledgers and other financial instruments that are then reported to Congress. Serial, lot, and registration numbers will be entered on receipt documents for those items that require serial and.

Special Accounting Policy, page This processing applies to all supplies received by the SSA except for those supplies received without documentation or requiring item identification where research must be conducted. When authorized substitute items SB —20, appendix G are on hand, the 710–2-2 item will be requested.

sr Expendable training ammunition requires designated responsibility through the use of hand receipts. The formula for location accuracy is—number of correct locations, divided by the total locations surveyed, timesequals location accuracy.

  EEN WAARDIG LEVENSEINDE IN EIGEN HAND PDF

AR 710-2 Supply Policy Below the National Level

This inventory is conducted per paragraph 2—12 d 2 and table 2—1i. The formula for inventory accuracy is—total lines without substantial difference, divided by total lines inventoried, timesequals the percentage of inventory accuracy.

The following applies to PLL diagnostic repair parts stockage:. Supply support for installations, U. Shop stocks are demand-supported repair parts and consumables stocked within a support-level maintenance activity, with a support-level maintenance mission authorized by an MTOE, TDA, or JTA.

This process applies to all customer requests regardless of priority performance objective.

AR Supply Policy Below The National Level

The State AG may authorize units a stockage level less than authorized quantities when personnel shortages exist or insufficient storage space is available. The Ad will use this information to develop tailored issues. Subparagraph a 2 b above applies.

No documentation is needed when returning SSSC items. Quantities may be increased effective with the first and subsequent reviews when supported by demand data. See DA Pam —2—1 for procedures. This is the timeframe expressed in the number of days from when an item is posted to the property book and issued to the customer.

See paragraph 1—1 b 13 for exceptions. This action facilitates transition of the unit to the new organizational document. The unit will not be charged for the found item. DPAS will be fielded to installations and nondeployable activities maintaining property qr, and enables the. All other policies relating to local purchase contained in this regulation remain in effect.

  DOGON PALE FOX PDF

Free Unfinished Flashcards about Supplies OCS

DA Pam —, chapter 11 prescribes addresses to whom quality 710-22-2 reports will be forwarded. Examples are items such as camouflage cover bands, tent pins, tent poles, and ropes. Also applies to senior and junior ROTC battalions.

Wartime Policy, page Transfer reports and deletion reports will be prepared and submitted per AR —3, chapter 5. After submitting an initiallist, units will give any changes to the SSA as they occur.

UNCLASSIFIED

The PBO ensures an inventory of all property issued on hand receipts per paragraph 2—12 dand table 2—1b and d. This paragraph contains policy modifications for the ARNG environment.

They will seekand most efficient and economical means of accomplishing assigned tasks and will limit requests for and use of material to the minimum essential. Use the following formula: The diagnostic repair parts are to be accounted for on PLL records for accountability purposes but are not part of the PLL.

Author: admin